Effective Friday, June 3, the C lot (Assaf) will be closed in preparation for construction. Over the summer, the retention pond near Assaf will be expanded, and C lot will be paved west toward the three-way stop by the Wold. The lot is scheduled to be ready when students return in the fall. The improvement will create 87 paved regular spaces and three disabled spots